![]() |
Access system in new WA |
Please find below a schematic overview of the attribution of access chains to the individual experimental zones in the upgraded West Area (from 1997 onward):
The changes with respect to the old layout (1996 and before) are the following:
The interlock elements for the different chains are the following:
| Chain | Elements in 2000 and after |
Situation from 1997 till end 1999 |
| H3tunnel | B3-H3, B4-H3, T1 out | B2-H3, B3-H3, TAX3-H3, TAX4-H3 |
| X5A | B1-X5, B2-X5, B3-X5, B4-X5 | B1-X5, B2-X5, B3-X5, B4-X5 |
| X5B | TDX-X5 | TDX-X5 |
| X7A | B1-X7, B2-X7, B3-X7, B4-X7 | B1-X7, B2-X7, B3-X7, B4-X7 |
| X7B | TDX-X7 | TDX-X7 |
| Chain-8 | MBBT6701, MBS6106, T1 out | MBBT6202, MBN620306, TAX3-H3, TAX4-H3 |
TT3 is no longer attached to an interlock chain.
In case a door is 'forced' (emergency passage), CHAIN-8 is cut, except for doors in the H3TUNNEL chain where CHAIN-5 is cut. The Chain-8 elements have been modified, too. See the table above.
The radiation facility "GIF" (door 125) has a private interlock system related to the radiator, but it can technically also be included in the beam interlock system, e.g. to the X5B chain.